다운더홀(DTH) 해머의 모델링 및 실험

2015 
Research and development of mineral resource related products has progressed with the increased need to develop mineral resources. The DTH hammer is one a resultant product. However, due to particular work conditions of underground drilling, it is difficult to obtain direct data on the DTH Hammer. A DTH drill rig requires a lot of money and time for actual testing. This thesis aimed to resolve this problem by using CAE. First, the structure of the DTH hammer and the movement was analyzed. Next, a standard model based on simulation was proposed and then experimentation and comparison verification was conducted. In addition, the verified models were applied to products of various sizes, and the models used in simulation were compared by conducting field tests.