Abstract Licensing calculations in a majority of countries worldwide still rely on the application of combined approach using best estimate computer code without evaluation of the code models uncertainty and conservative assumptions on initial and boundary, availability of systems and components and additional conservative assumptions. However best estimate plus uncertainty (BEPU) approach representing the state-of-the-art in the area of safety analysis has a clear potential to replace currently used combined approach. There are several applications of BEPU approach in the area of licensing calculations, but some questions are discussed, namely from the regulatory point of view. In order to find a proper solution to these questions and to support the BEPU approach to become a standard approach for licensing calculations, a broad comparison of both approaches for various transients is necessary. Results of one of such comparisons on the example of the VVER-440/213 NPP pressurizer surge line break event are described in this paper. A Kv-scaled simulation based on PH4-SLB experiment from PMK-2 integral test facility applying its volume and power scaling factor is performed for qualitative assessment of the RELAP5 computer code calculation using the VVER-440/213 plant model. Existing hardware differences are identified and explained. The CIAU method is adopted for performing the uncertainty evaluation. Results using combined and BEPU approaches are in agreement with the experimental values in PMK-2 facility. Only minimal difference between combined and BEPU approached has been observed in the evaluation of the safety margins for the peak cladding temperature. Benefits of the CIAU uncertainty method are highlighted.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    9
    References
    7
    Citations
    NaN
    KQI
    []