1-D neutronics optimization design for ITER CH HCSB TBM

2006 
The neutronics problem of the TBM module design connects closely with TBM’s other problems, such as, tritium generation, thermo-hydraulic, safety, etc. An exact neutronics calculation for the TBM module is very important. Based on the 1-D calculation model given in the CH HCSB TBM design, a better 1-D neutronics optimization has been performed using the ONEDANT code with related database.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []