Experience gained from automation of starting operations in a 200-MW two-boiler single-turbine power unit equipped with once-through coal-fired boilers

2011 
Results obtained from a large set of investigations, search for, and perfection of the technology for starting 200-MW two-boiler single-turbine power units from different thermal states are presented. An algorithm for automated starting of the boiler shell from its hot state is given as an example.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    0
    Citations
    NaN
    KQI
    []