Optimization of Software Cost Model with Warranty and Delivery Delay Costs

2005 
Computer software has gradually become an indispensable elements in many aspects of our daily lives and an important factor in numerous systems. In recent years, it is not unusual that the software cost is more than the hardware cost in many situations. In addition to the costs of developing software, the repair cost resulting from the software failures are even more significant. In this paper, a cost model with warranty cost, time to remove each fault detected in the software system, and delivery delay cost is developed. We use a software reliability model based on non-homogeneous Poisson process (NHPP). We discuss the optimal release policies to minimize the expected total software cost. Numerical examples are provided to illustrate the results.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    5
    References
    0
    Citations
    NaN
    KQI
    []