Transmission Expansion Planning Test System for AC/DC Hybrid Grid With High Variable Renewable Energy Penetration

2019 
Test systems are important tools and benchmark for power system research. Currently, there is a lack of standard test systems for modern transmission expansion planning (TEP) research, especially under high variable renewable energy (VRE) penetrations. This paper describes a 38-bus test system named the HRP-38 system dedicated to TEP. "HRP" stands for high renewable penetration. The objective of establishing such a system is to provide a consistent platform for different TEP methods to be tested and compared. The test system considers high VRE penetration of more than 30% energy share, which will be an important feature in many power systems in the future. Both AC and DC candidate lines are given to provide sufficient transmission planning alternatives. The complexity of the test system is well balanced considering calculation tractability and the ability to test the performance of the TEP planning model. The network topology, generation mix, and load characteristics are described in detail. Year-round time series of VRE (wind power and PV) output and load curves for each bus are provided to facilitate a detailed evaluation of the transmission grid configuration under high VRE penetration. Finally, four benchmark results with different optimization targets are provided for the HRP-38 system.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    27
    References
    15
    Citations
    NaN
    KQI
    []