Beam position monitor and its calibration in J-PARC LINAC

2007 
The beam commissioning of J-PARC LINAC has been started in November 2006. Beam position monitors (BPMs) which had been calibrated on the bench setup with a scanning wire, take beam-based-calibration method in order to enable the beam to pass at the centre of a quadrupole magnet (Q-magnet). In this presentation, the installed BPMs and their calibration methods are described.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    3
    References
    3
    Citations
    NaN
    KQI
    []