Engineering design of the IFMIF EVEDA reference test cell and key components

2014 
Abstract The latest design updates of the IFMIF-EVEDA reference test cell (TC) are described with emphasis on the following key components: active cooling pipes for concrete biological shielding walls and stainless steel liner, TC gas leak tight boundary, and piping and cabling inside TC and between TC and the access cell (AC). Water cooling is adopted for concrete shielding walls and the liner. Buried pipes are selected for active cooling of the TC surrounding shielding walls; directly welded pipes on the liner are used to remove nuclear heat of the liner. Technical features and layout of the cooling pipes are preliminary defined. The TC vacuum boundary, which includes the TC liner, an independent TC cover plate, a rubber based sealing gasket, and welding seams between interface shielding plugs and TC liner, is described. Engineering design of the piping and cabling plugs as well as the arrangement of pipes and cables under the TC covering plate and the AC floor are updated. Pipes and cable tunnels inside the shielding plugs are arranged with several bends for minimizing neutron streaming from inside to outside of the TC. Pipes, cables, and the corresponding penetrations between the TC and the AC are carefully arranged for convenient access and maintenances.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    9
    References
    8
    Citations
    NaN
    KQI
    []