language-icon Old Web
English
Sign In

Upgrading the PSI Muon Facility

2001 
A new project was initiated at PSI to replace the existing μE4 decay channel with a new beam line delivering surface/cloud beams of highest luminosities. This goal will be accomplished by installing a solenoidal lens system at the main production target E and then transporting the muons with conventional beamline elements of very big apertures to a greatly enlarged experimental floor. Several slit systems and an electrostatic separator will be available to control the beam shape and reduce the electrons and other background.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    4
    References
    4
    Citations
    NaN
    KQI
    []