Progress in the integration of the ITER plant systems in auxiliary buildings

2016 
Abstract The ITER Tokamak machine is located in the center of Tokamak complex buildings consisting of Tokamak, Diagnostic, and Tritium buildings. Around the Tokamak complex there are over 30 auxiliary buildings housing various plant systems serving the Tokamak machine either directly or indirectly. The layout and space allocation of each auxiliary building and plant systems housed by the building are represented in the so-called Configuration Management Models (CMM). These are light 3D CAD models that define the required space envelope and the physical interfaces between the systems and the buildings and in-between the systems. The paper describes the CMM and interface management processes of the ITER auxiliary buildings and plant systems, and discusses the preparations for the plant installation phase. In addition, the current baseline configuration of the ITER plant systems in auxiliary buildings is described together with the recent developments in the configuration of different systems, as well as the current status of the construction of the buildings.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    1
    Citations
    NaN
    KQI
    []