The CLIC BDS Towards the Conceptual Design Report

2012 
The CLIC Conceptual Design Report (CDR) must be ready by 2010. This paper aims at addressing all the critical points of the CLIC Beam Delivery Systems (BDS) to be later implemented in the CDR. This includes risk evaluation and possible solutions to a number of selected points. The smooth and practical transition between the 500 GeV CLIC and the design energy of 3 TeV is also studied.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    2
    Citations
    NaN
    KQI
    []