Geochemical Evaluation (Room G): In situ data report, December 1984-- November 1990

1992 
Data are presented from the Geomechanical Evaluation (first phase), a very large scale in situ test fielded underground at the Waste Isolation Pilot Plant (WIPP). These data include selected fielding information, test configuration, instrumentation activities, and comprehensive results from a large number of gages. Construction of the test began in December 1984 and the test has been in operation since that time; gage data in this report cover the period from December 1984 through November 1990.