Data Collected on TPAD Implementation Projects

2014 
Total pavement acceptance device (TPAD) testing was conducted by Center for Transportation (CTR) personnel at the following locations during Texas Department of Transportation (TxDOT) Project 5-6005-01: Statewide Implementation of Total Pavement Acceptance Device (TPAD) (January 2013 through August 2014): (1) San Marcos Airport, (2) IH 10 in El Paso (two tests conducted at this site), (3) US 75 in Sherman, (4) IH 27 in Lubbock and Amarillo, (5) US 287 in Quanah, (6) US 287 in Childress, and (7) SH 288 in Houston. This document consists of the data from the testing.