Conventional tunneling excavation 10 meters below existing river using 25-meter long forepoling and controlled blasting method, Pahang-Selangor Raw Water Transfer Tunnel Project, Malaysia

2013 
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []