Conventional tunneling excavation 10 meters below existing river using 25-meter long forepoling and controlled blasting method, Pahang-Selangor Raw Water Transfer Tunnel Project, Malaysia
2013
Keywords:
- Correction
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI