Modified Calculation Model for Segment Floating in Slurry Shield Tunnel
2021
AbstractConcrete remains the most commonly used material for lining segments in shield tunnels. Extensive segment floating can easily result in segment dislocation, crack damage, and water leakage....
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
34
References
0
Citations
NaN
KQI