Application of the Equipment Replacement Dynamic Programming Model in Conveyor Belt Replacement: Case Study of a Gold Mining Company

2015 
As assets age, they generally deteriorate, resulting in rising operating and maintenance costs and decreasing salvage values. In this paper a comprehensive Dynamic Programming-based optimisation solution methodology is used to solve the equipment replacement optimisation problem on the replacement of conveyor belts at a Gold Mining company in Zimbabwe. Given a mining setup with one and two-year old conveyor belts the ultimate objective is to keep or replace the conveyor belt such that the overall cost of material handling is minimised within a five-year period. The findings reveal that this mining system should replace conveyor belts yearly. It is concluded that, an equipment replacement policy for conveyor belts is a necessity in a mining system so as to achieve an optimal contribution to the economic value that a mining system may accrue within a period of time. DOI: 10.5901/mjss.2015.v6n2s1p605
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    18
    References
    6
    Citations
    NaN
    KQI
    []