Deep water silt layer geological large-span multi-line reinforcing system and jacking culvert construction method
2014
The invention relates to a deep water silt layer geological large-span multi-line reinforcing system and a jacking culvert construction method, and aims at providing a reinforcing system and a construction method for a high-water-level, long-jacking-stroke, large-span and high-tonnage jacking culvert to penetrate through multiple existing lines. The reinforcing system comprises a high-pressure jet grouting secant pile, a fender pile, an anti-traversing pile and a supporting pile. The jacking culvert construction method comprises the steps of starry well-point dewatering, foundation pit excavation and sliding plate fabrication, frame bridge prefabrication, line reinforcement, jacking equipment installation and process control. By adopting starry well-point dewatering, the problems of underground water burst and foundation instability during jacking are solved; since a frame bridge is integrally jacked after being prefabricated, the rigidity is high, the seismic performance is good and the influence by climate is smaller; compared with the traditional construction method, the reinforcement and the installation are convenient and easy to operate, the jacking speed is quick and the construction period is shortened; I-shaped steel, steel rails and sleepers used for engineering can be recycled; the overall economic benefits are remarkable, the practical value is greater and the application prospect is wide.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI