Fast and batched electric energy meter start-up test method

2016 
The present invention relates to a fast and batched electric energy meter start-up test method. Larger current is adopted to pass through a front part of energy, target energy consumption 1500J, 2100J, 2400J and 2700J is verified; the current is switched to the original current IQ=0.005Ib, and therefore, start-up test time can be decreased. According to the fast and batched electric energy meter start-up test method of the invention adopted, waiting time before a batched electric energy meter start-up test and test time are shortened, so that batched electric energy meter verification efficiency can be effectively improved. The method can be applied to verification systems of various kinds of manual and automated electric energy metering devices. With the fast and batched electric energy meter start-up test method adopted, smart energy meter verification schemes are further improved, and meter use demands of power supply units can be satisfied; and the verification level of metering verification devices can be improved.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []