NUCLOTRON EXTRACTED BEAM DIAGNOSTICS

2002 
Twenty-two runs of the superconducting synchrotron Nuclotron have been performed by the present time. The Nuclotron Control System (NCS) provided an efficient support for the machine operation during all runs. The first experiments with the Nuclotron Beam Slow Extraction System (BES)[1] were carried out in December 1999. After the BES commissioning, the study of the system was continued together with experiments on relativistic nuclear physics. At the same time, extracted beam diagnostics was intensively developed.