Blind penetrating installation guide structure

2016 
The invention provides a blind penetrating installation guide structure. The blind penetrating installation guide structure comprises an upper flange plate and a lower flange plate which are both provided with bolt holes in a corresponding mode, flange plate bolts are installed in the bolt holes in the lower flange plate, and guide rods are connected to the ends, away from bolt caps, of the flange plate bolts. According to the blind penetrating installation guide structure, the defect that hole penetrating of an upper flange is difficult due to the fact that the direction of the bolts is deflected in the lifting process can be effectively overcome, so that guide rod cone bodies are successfully guided into the upper flange plate according to the principle, then, external threads on the bolts are matched with internal threads on the bolt holes of the upper flange plate and internal threads on the bolt holes of the lower flange plate so that the flange plate bolts can be bolted, and the guide rods are dismantled. A towering precious metal tower mast is fixed to a to-be-installed part, so that one-time positioning installation of the towering precious metal tower mast is achieved; and complex operation is changed to be simple, and high efficiency, quickness and stableness are achieved.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []