Assessing the need for an update of a probabilistic seismic hazard analysis using a SSHAC Level 1 study and the Seismic Hazard Periodic Reevaluation Methodology
2017
Abstract A key decision for nuclear facilities is evaluating the need for an update of an existing seismic hazard analysis in light of new data and information that has become available since the time that analysis was completed. We introduce the newly developed risk-informed Seismic Hazard Periodic Reevaluation Methodology (referred to as the SHPRM) and present how a Senior Seismic Hazard Analysis Committee (SSHAC) Level 1 probabilistic seismic hazard analysis (PSHA) was performed in an implementation of this new methodology. The SHPRM offers a defensible and documented approach that considers both the changes in seismic hazard and engineering-based risk information of an existing nuclear facility to assess the need for an update of an existing PSHA. The SHPRM has seven evaluation criteria that are employed at specific analysis, decision, and comparison points in a graded approach, based on the nuclear facility's seismic design category. The SHPRM is implemented using a SSHAC Level 1 study performed for the Idaho National Laboratory, USA. The implementation focuses on the SHPRM evaluation criteria that are based directly on the seismic hazard, and the inputs to these criteria are derived from the SSHAC Level 1 PHSA. To illustrate outcomes of the SHPRM that do not lead to the need for an update and those that do, the example implementations of the SHPRM are performed for nuclear facilities that have target performance goals expressed as the mean annual frequency of unacceptable performance at 1 × 10 −4 , 4 × 10 −5 and 1 × 10 −5 .
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
12
References
3
Citations
NaN
KQI