Upgrade of the Firing and Control System at Egyptalum for Dual Fuel Firing

2016 
Based on the recent upgrade of the existing anode baking furnace no.1 at Egyptalum, Egypt, the paper will demonstrate the improvements that have been achieved by introducing a new and flexible firing and control system on the baking furnace.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []