The extended resource task network: a framework for the combined scheduling of batch processes and CHP plants

2012 
The issue of energy has emerged as one of the greatest challenges facing mankind. In an industrial perspective, the development of site utility systems (generally combined heat and power (CHP) systems) for the generation and management of utilities provides a great potential source for energy savings. However, in most industrial sites, a master-slave relationship usually governs this kind of system and limits the potential operating capacity of CHP. To improve the decision-making process, Agha et al. (2010. Integrated production and utility system approach for optimising industrial unit operation. Energy, 35, 611-627) have proposed an integrated approach that carries out simultaneous and consistent scheduling of batch production plants and site utility systems. The modelling of the problem relies on a mixed integer linear programming (MILP) formulation. Nevertheless, although it is a powerful mathematical tool, it still remains difficult to use for non-expert engineers. In this framework, a graphical formalism based on existing representations (STN, RTN) has been developed: the extended resource task network (ERTN). Combined with an efficient and generic MILP formulation, it permits various kinds of industrial problems, including production and consumption of utility flows to be modelled homogenously. This paper focuses on the semantic elements of the ERTN formalism and illustrates their use through representative examples.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    13
    References
    52
    Citations
    NaN
    KQI
    []