Construction Scheme of Continuous Beam Bridge Closure Segment

2014 
Taking Huaihe bridge as an example, this paper discusses the technology and scheme of continuous beam bridge closure segment construction in detail, and proposes some measures and requirement for mid span closure segment construction in non-designed closure temperature.It hopes to provide reference for similar construction of cantilever continuous beam bridge closure segment.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []