The Granitztal Tunnel Chain – State of works on the second longest tunnel system on the Koralmbahn / Tunnelkette Granitztal – Stand der Arbeiten für das zweitlängste Tunnelsystem an der Koralmbahn

2016 
The Granitztal Tunnel Chain is not only the second longest tunnel system on the Koralmbahn line but also an essential part of the future new railway line between Graz and Klagenfurt (New South Range Line). At the time of reporting, more than two-thirds of the tunnel excavation works on the Graniztal contract are completed. After a detailed description of the project with four simultaneously advancing TBM drive and the extensive concreting ad earthworks in the Granitztal, the geological and geotechnical conditions and the experience gained until now are described. Particular attention is paid to the challenging geotechnical conditions in the Langer Berg section and the overground section in the Granitztal. The intensive design work to optimise future maintenance work is also described. Mit der Tunnelkette Granitztal entsteht derzeit nicht nur das zweitlangste Tunnelsystem an der Koralmbahn, sondern ein wesentlicher Mosaikstein fur die kunftige Hochleistungsstrecke zwischen Graz und Klagenfurt. Zum Berichtszeitpunkt wird mehr als zwei Drittel der Vortriebsarbeiten fur dieses Baulos abgeschlossen sein. Nach einer detaillierten Beschreibung des Projekts mit seinen vier gleichzeitig laufenden Vortrieben und den umfangreichen Beton- und Erdarbeiten im Granitztal wird uber die geologischen und geotechnischen Verhaltnisse und die bis dato gewonnenen Erkenntnisse berichtet. Besonderes Augenmerk wird auf die anspruchsvollen geotechnischen Verhaltnisse im Abschnitt Langer Berg sowie im Ubertage-Abschnitt Granitztal gelegt. Weiters wird uber die intensiven Planungsaktivitaten zum Zwecke der Instandhaltungsoptimierung berichtet.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    2
    References
    2
    Citations
    NaN
    KQI
    []