OPERATION AND CONTROL OF PARTICLE ACCELERATORS

1959 
Discussion is given on possible dangers to personnel during the operation of the accelerator at Liege, France. A schematic diagram of the electric system of the Cockroft-Walton accelerator is given. Some discussion is also given on the regenerative circuit, vacuum pumps. valves, and circuits. (P.C.H.)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []