Field Test Research on Embankment Supported by Plastic Tube Cast-in-place Concrete Piles

2013 
The plastic tube cast-in-place concrete pile (TC pile) with a small diameter consists of pre-driven plastic tube filled with concrete. Based on the case of TC pile-reinforced embankment on soft ground, and according to the monitoring data of the TC pile-reinforced embankment system, the treatment effect and reinforcement characteristics for this system were analyzed. The field monitoring results indicates that the critical height of embankment is about 1.1 times the pile net spacing, and the small-spacing arranged TC piles can be applied to low embankment engineering; the load share rate can reflect the degree of soil arching more better and steadily and exceeds 70 % at the end of monitoring period; the settlements of pile cap and soil between piles mainly occurs in the embankment construction period; the different settlement between pile cap and soil approaches the maximum and then reduces gradually when the embankment height is about 2.2 times the pile net spacing. The variation of layered settlement and pore water pressure illustrates that the embankment settlement is mainly caused by the compression of soils within pile length, which is about 90 % of the total settlement; the influence depth of pore water pressure is about 1/3 pile length.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    24
    References
    7
    Citations
    NaN
    KQI
    []