DEVELOPMENT OF SPILL CONTROL SYSTEM FOR THE J-PARC SLOW EXTRACTION

2009 
J-PARC (Japan Proton Accelerator Research Complex) is a new accelerator facility to produce MW-class high power proton beams at both 3GeV and 50GeV. The Main Ring (MR) of J-PARC can extract beams to the neutrino beam line and the slow extraction beam line for Hadron Experimental Facility. The slow extraction beam is used in various nuclear and particle physics experiments. A flat structure and low ripple noise are required for the spills of the slow extraction. We are developing the spill control system for the slow extraction beam. The spill control system consists of the extraction quadrupole magnets and feedback control device. Here we report their construction status.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    3
    References
    3
    Citations
    NaN
    KQI
    []