The invention relates to the field of inclined shaft top brushing, in particular to an oblique-crossing inclined shaft upper arc guide top brushing construction method for a soft crushed rock layer, and solves the problems of the existing inclined shaft top brushing construction adopting small pilot tunnel top brushing. The method comprises the following steps of: setting curve transition at the intersection of an inclined shaft and a front tunnel so that an inclined shaft mouth is orthogonal with the front tunnel; arranging a door-shaped steel frame support at the intersection, wherein a steel arch frame of the front tunnel is firmly connected with the door-shaped steel frame; arranging a cover arch support at the section close to the front tunnel and inclined shaft; additionally arranging an I-shaped steel cross arm on a bottom plate; performing top brushing by use of an upper arc guide within the front tunnel range, wherein the last arch frame of the upper arc guide is vertical to the line direction, and the arch top is level with the arch top of the front tunnel; performing expanded excavation along the cross section of the front tunnel, and constructing an upper guide primary support of the front tunnel; reversely dismantling the steel arch frame temporary supports of the upper arc guide one by one, and constructing an upper guide primary support of the front tunnel on the other side; and performing normal construction within the front tunnel range to finish the top brushing. Through the invention, the working efficiency is improved, the construction is accelerated, the safety risk is lowered, the inclined shaft top brushing construction is safely, quickly, perfectly and efficiently finished, and a good effect is obtained.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI