Proposing a Pre-emptive Resource Constrained Project Scheduling Problem (PRCPSP) Model to Optimize Manpower and Project Delivery Time (A Case Study)
2021
In this paper, a Pre-emptive Resource Constrained Project Scheduling Problem (PRCPSP) mathematical model is proposed to schedule a production project by considering uncertainty of time parameter for each activity. At last to evaluate the validity of the model, the mathematical model is implemented in a production factory and the results have been evaluated. In addition, some analyses are implemented to assess the behavior of the model and extract managerial insights.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
6
References
0
Citations
NaN
KQI