D5.4 – Pilots quality report round 2

2018 
In this deliverable, we discuss the implementation details of the second round of pilots led by WP5 partners (Okkam, HCUK, SPL, EPJ, and RANDST) to test the serious games created by game developers with RAGE ecosystem’s assets. The document presents for each partner the validation experiments conducted between December 2017 and November 2018, with details related to design, methodology and instruments used in the different experiments. In addition, details about the implementation and participants will be provided, together with a discussion about risk management for each partner respect the execution of the game. The results presented in this document must be complemented with those reported in D8.4, Second Evaluation Report, where the analysis of scientific aspects is presented. D5.4 can be read as the premise to D8.4 where the results of the evaluation are detailed and a comparison between pilot 1 and pilot 2 is discussed.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []