The origin reasons and prevention of vertical date stone fracture of cast-in-place concrete frame beam
2009
The vertical date stone fracture occurred in cast-in-place concrete frame beam was analyzed,the main formation reasons were illustrated.The problems need be noticed in design and construction and common treating method principle after occurring fracture were proposed,so as to accumulate experience for future frame construction.