Construction technology of overlap tunnel in Laoda zone of Shenzhen metro

2004 
Taking practical work in Shenzhen metro as example the general engineering situations are introduced and based upon analysis of the engineering features with complicated geological conditions and dynamic mechanical relation of approach construction the difficulties encountered in overlap tunnel construction are mainly discussed; at the same time corresponding resolving measures are proposed.