Oil shale project run summary large retort run L-1

1981 
L-1, a Modified In-Situ run, was performed in the 0.9 x 6.1 m retort on April 12 to 16, 1977. The retort charge was Anvil Points shale. L-1 showed that reasonable oil yields (72% of Fischer assay) can be achieved even from rubble beds which induce complex nonuniform gas flow patterns. (DLC)
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []