Major safety and operational concerns for fuel debris criticality control

2013 
It can be seen from the criticality control viewpoint that the requirement divides the decommissioning work into two parts. One is the present condition where it is requested to prevent criticality and to monitor subcritical condition while the debris is untouched. The other is future work where the subcritical condition shall be ensured even if the debris condition is changed intentionally by raising water level, debris retrieval, etc. Repair of damages on the containment vessel (CV) walls is one of the most important objectives at present in the site. On completion of this task, it will become possible to raise water levels in the CVs and to shield the extremely high radiation emitted from the debris but there is a dilemma: raising the water level in the CVs implies to bring the debris closer to criticality because of the role of water for slowing down neutrons. This may be solved if the coolant water will start circulating in closed loops, and if a sufficient concentration of soluble neutron poison (borated water for instance) will be introduced in the loop. It should be still noted that this solution has a risk of worsening corrosion of the CV walls. Design of themore » retrieval operation of debris should be proposed as early as possible, which must include a neutron poison concentration required to ensure that the debris chunk is subcritical. In parallel, the development of the measurement system to monitor subcritical condition of the debris chunk should be conducted in case the borated water cannot be used continuously. The system would be based on a neutron counter with a high sensitivity and an appropriate shield for gamma-rays, and the adequate statistical signal processing.« less
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    3
    Citations
    NaN
    KQI
    []