On application of seperated guiding beam bench in whole circle tunnel lining structure construction

2009 
By combining with the project characteristics of the third section at west ring in Beijing covered culvert in the water supply construction in south-north water transfer project,and designs the new bench for the whole circle tunnel disposable lining structure,introduces the application of the seperated guiding beam bench,and points out its wide application future.