Method for plugging relief well of deep foundation pit

2013 
The invention discloses a method for plugging a relief well of a deep foundation pit. The method comprises the following steps of (1) necessary preparation before relief well plugging; (2) plugging construction on the relief well, wherein after base plate construction is completed, a body structure meets anti-floating requirements, and a fixed water level in a relief well in the foundation pit is located 2-3m below a foundation pit face, the plugging construction on the relief well can be carried out, the relief well in a working state is firstly plugged in an interval mode due to a large water yield, after the relief well is partially plugged, the working state of the relief well which is not plugged continues to be observed and comprises the water yield condition, the variation value of the water level, the fixed water level elevation and the water pump position elevation, the rest of the relief well continues to be plugged in an interval mode, and time is earned for well plugging by increasing pump output. The method has the advantages that the relief well can be successfully plugged when underwater pressure or water inflow is large, plugging quality is good, construction cost is lowered, and the method is worthy of popularization and application.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []