Breakdown process experiments of cap-and-pin insulators and their EMT leader progression model implementation

2017 
Here, breakdown tests of cap-and-pin glass insulators with arcing horns, conducted at two different HV labs, are presented. Since only volt–time curves are measured, a curve-fitting approach to determine leader progression model parameters is taken, which involves modelling of the impulse generator in detail and inclusion of the Motoyama model to simulate the breakdown. Furthermore, a comparison of the breakdown simulation results with LPM parameters for a pure air gap and the measurements is accomplished. Finally, a curve-fitting procedure is developed to fit the resulting volt–time curves from simulations to the measurements.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    16
    References
    1
    Citations
    NaN
    KQI
    []