language-icon Old Web
English
Sign In

A flexible approach

2000 
The Maltese national grid is isolated and subject to wide load variations. The country's first CCGT power plant, Delimara, was therefore designed with a high degree of load flexibility, and is successfully operating in cycling duty mode.
    • Correction
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []