Energize Pelanggan Tegangan Menengah Premium Gold Dengan Skema Setting Automatic Change Over (ACO) Di PT. PLN UP3 CIPUTAT

2020 
ACO (Automatic Change Over) is a cubicle that has two different sources of power supply and can work automatically to switch to a backup source in the event of a disturbance / loss of voltage at one of the sources. To determine the ACO setting using the feed load factor calculation and voltage drop, to determine the ACO settings will use a priority or non priority system. To find out the load factor of the feeder, it can be calculated using the WBP and LWBP data of the feeder to be used, as well as the calculation of the voltage drop to determine which feeder will be the main source and the backup source. The distribution of concrete substations for special customers of the Ministry of Religion is supplied from the Bintaro Main Substation with sewing feeder 1 with a load factor value of 0,446 with a voltage drop of 147.82 volts, with the Pondok Indah substation with Samdoria feeders with a load factor of 0,412 and a voltage drop of 13.65 volts from the results of these calculations, you can get the results of the ACO setting with the sewing feeder as the main supply and the Samdoria feeder as the backup supply.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []