Conceptual Logic Production Line Modelling System

2013 
Many industrial sectors on the world are structured as a series as the production stages. Row material come from the beginning of the first step and enter into the process which various kind of processes like bath and continue where limited in the time as the constrain of the flow of the process to transfer to be products in to the next step, in the process they usually use conceptual logic or separately equipment to separate the eligible product and send second product to transfer to another equipment to be additional process where it should be make the added value for the second product. This modelling do the conceptual logic in production line system and analyse the factor of time between arrival raw material in the warehouse then directly process to the process unit then send it again to to the next process as well. The result of this study are decreased sharply in the beginning of the initial times for variables like number of waiting or queue, total process time, utilization and total entity time but increased the idle cost. This KPI are the indicators from the process for the triangular probability most likely value in the process.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []