In September 1992, the POC test LMF5-J was concluded at the CFFF in accordance with the objectives as set for the western coal POC test program. During this activity, a {open_quotes}piggyback{close_quotes} type test was conducted for the Busek Company in partial fulfillment of a DOE Phase II SBIR. A near prototypical design, generator module that was designed and constructed by the Busek Co. was installed in the LMF upstream test train of the CFFF for this test. The module incorporated AlN{sub 2} (ceramic) sidebar elements. The objective of the SBIR Phase II was to evaluate the integrity of this material subject to long duration operation under typical coal-fired MHD generator conditions. A summary of the LMF5-J test at the CFFF and activities and test results relevant to the SBIR Phase II related to the Busek SBIR project are provided.