Innovative Water Shut Off Solution Combining Real Time Downhole Measurement and Analysis with Zonal Isolation Technologies for Horizontal Open Hole Producer in Ratawi Field - A Case History from Partitioned Zone

2011 
The increasing water production in mature fields has a significant impact on production economics. A structured approach is required to tackle this challenge. Water shut-off (WSO) operations in open-hole horizontal wells do not carry a high success rate, however, careful candidate recognition and treatment can improve the chance of success. Ratawi is an Oolitic Limestone reservoir in Wafra oilfield, Partitioned Zone (PZ) between Saudi Arabia and Kuwait. The reservoir has been undergoing water-flooding for pressure maintenance since 1998. Majority of the wells are completed as open-hole horizontal producers on artificial lift.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    1
    References
    1
    Citations
    NaN
    KQI
    []