Cryogenic methane separation/catalytic hydrogasification process analysis. Quarterly report
1981
The objective of this coordinated research program is to obtain the most attractive combinations of acid gas removal, methane separation for the Exxon Catalytic Coal Gasification (CCG) and the Rockwell/Cities Service Hydrogasification processes. The program is divided into nine subtasks with each subtask studying the effect of variation of a key design parameter on the treatment cost of the SNG produced. Progress reports of 8 subtasks are presented. The following are some of the highlights. Subtask 1 - Heat and material balance and equipment sizing was completed for the cryogenic methane separation. The overall material balance is presented in a table. Subtask 2 - Preliminary designs for MEA and DEA gas removal systems were established. Subtasks 3 to 5 - Economic evaluation is in proress. Subtask 6 - The SNG product compressor train was simulated for the case where sufficient SNG fuel is withdrawn from the product compressors to fire the dryer reactivation heater. Subtask 7 - Acid gas removal and cryogenic separation equipment was resized to accommodate Exxon's request for a two-train plant design. Subtask 8 - The Benfield and Selexol systems will be evaluated for acid gas removal.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI