The construction of the Crystal Houses façade: challenges and innovations

2018 
A novel glass brick facade has been designed and engineered to reproduce the original brick facade of a former townhouse in Amsterdam. Based on the original design the resulting facade comprises more than 6500 solid glass bricks, reinterpreting the traditional brick pattern, and elaborated cast glass elements for the replication of the window and door frames. To achieve unhindered transparency, the 10 by 12 m glass block facade has to be self-supporting. Previous experimental work by Oikonomopoulou et al. (J Facade Design Eng 2(3–4):201–222, 2015b. doi:10.3233/fde-150021) concluded that it was necessary to use a clear, UV-curing adhesive of high stiffness as bonding material. Experimental work on prototype elements indicated that the desired monolithic structural performance of the glass masonry system, as well as a homogeneous visual result, are only achieved when the selected adhesive is applied in a 0.2–0.3 mm thick layer. The nearly zero thickness of the adhesive together with the request for unimpeded transparency introduced numerous engineering challenges. These include the production of highly accurate glass bricks and the homogeneous application of the adhesive to achieve the construction of the entire facade with remarkably tight allowable tolerances. This paper presents the main challenges confronted during the construction of the novel facade and records the innovative solutions implemented, from the casting of the glass units to the completion of the facade. Based on the conclusions of the research and the technical experience gained by the realization of the project, recommendations are made on the further improvement of the presented glass masonry system towards future applications.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    12
    References
    14
    Citations
    NaN
    KQI
    []