Reservoirs operation and water resources utilization coordination in Hongshuihe basin
2018
Abstract. In the recent decade, the demand for water resources has been increasing with
the economic development. The reservoirs of cascade hydropower stations in
Hongshuihe basin, which are constructed with a main purpose of power
generation, are facing more integrated water resources utilization problem.
The conflict between power generation of cascade reservoirs and flood
control, shipping, environmental protection and water supply has become
increasingly prominent. This paper introduces the general situation and
integrated water demand of cascade reservoirs in Hongshuihe basin, and it
analyses the impact of various types of integrated water demand on power
generation and supply. It establishes mathematic models, constrained by
various types of integrated water demand, to guide the operation and water
resources utilization management of cascade reservoirs in Hongshuihe basin.
Integrated water coordination mechanism of Hongshuihe basin is also
introduced. It provides a technical and management guide and demonstration
for cascade reservoirs operation and integrated water management at home and
abroad.
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
1
Citations
NaN
KQI