Baseline health situation of communities affected by the Nam Theun 2 hydroelectric project in central Lao PDR and indicators for monitoring

2008 
Hydroelectric projects offer opportunities for infrastructure development and economic growth; yet, if not well designed, implemented and operated, they have the potential to negatively affect the health and well-being of local and distant downstream communities. Remote rural populations are particularly vulnerable to the sudden influx of men, materials and money, and associated population mixing that accompany project construction phases. Two large-scale baseline health surveys, carried out in 2001/2002 in two communities that were affected by the Nam Theun 2 hydroelectric project in central Lao PDR, were analysed. For the population to be resettled on the Nakai plateau it was observed that access to clean water and basic sanitation facilities was lacking. Faecal examinations revealed a high infection prevalence for Ascaris lumbricoides (67.7%), but relatively low prevalences for hookworm (9.7%), Taenia spp. (4.8%), Enterobius vermicularis (4.4%), Trichuris trichiura (3.9%), Strongyloides stercoralis (1....
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    48
    References
    31
    Citations
    NaN
    KQI
    []