A Feasibility Study of Frequency Regulation Energy Storage System Installation in a Power Plant

2020 
The aim of this work is to analyze and stabilize the power system when connecting an energy storage system (ESS) to replace the traditional power reserve of a power plant. Thus, it is necessary to validate and simulate the power facility protection system using a relay coordination approach. The input feasibility of the generator for the frequency regulation (FR) of the operational ESS is also validated through detailed analysis studies including power flow, short circuit and relay coordination analysis. The case scenarios for ESS installation are categorized based on its operation mode and location in the power system. These studies are carried out on the power system at the peak load condition specified for both grids. With the electrical transient analyzer program (ETAP), an analysis is performed to study the implementation of the ESS in a large, integrated power system to determine which location best fits the installation of ESS considering the load flow, short circuit and relay coordination results in each case scenario. Cost evaluation was performed for the choice of locations under study.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    2
    Citations
    NaN
    KQI
    []