The Uneven Settlement Cause and Settlement Prediction of Xi Ying Sluice

2015 
Xi Ying sluice built in Xishi River, Changzhou City, is a single span sluice with width of 6m. The chamber is pier wall structure of depressed reinforced concrete floor, when the chamber had a filling and discharging water during construction period, we found that the chamber appeared large uneven subsidence. According to the design, construction and other specific circumstances of Xi Ying sluice, by using three-dimensional finite element method to calculate and analyzed the settlement of the sluice, we studied on the genesis of the uneven settlement and predicted the settlement after the running. Analysis shows that the chamber of the uneven settlement is due to the jacking effect of concrete pile. The settlement has been basically completed caused by chamber weight, there will not be a substantial settlement; In the case of blocking water during operation period, chamber’s settlement increment outside the river side and inside the river side are respectively 0.3mm and 0.4mm; through processing, the settlement of chamber won’t affect the normal operation of sluice.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []