The practical challenges of converting end-use data into information

1990 
This paper focuses on issues faced by large-scale end-use data collection projects after the project design and meter installation. End-use data load data analysis presents unique problems, often centered on data management. The sheer size of the data collected, the frequency of change in the metered buildings, the need for integration of metered data and building characteristic data, and the need for information rather than just raw data are all problems that each new project must face. 1 fig., 1 tab.
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    0
    References
    0
    Citations
    NaN
    KQI
    []